DEVELOPMENT
What we have built.
What remains to verify.
These stages reflect the available development materials. A software build or circuit simulation is not full-product field validation.
| Area | Available evidence | Next check |
|---|---|---|
| AFE | LTspice transient, AC and noise model tests | Physical inputs, power and wiring |
| Firmware | ESP32-S3 build and communication code baseline | Board flashing, physical sensor and endurance |
| Data software | Collection, storage and dashboard baseline | Device integration and failure testing |
| Measurement | Validation targets being defined | Distance, repeatability, calibration and environment |
| Fab pilot | Preliminary scope discussion | Entry, operation and acceptance criteria |
Physical validation comes next.
- 01
Integrate
Connect sensing, circuit, power and control.
- 02
Calibrate
Compare against reference equipment under defined conditions.
- 03
Pilot
Evaluate suitability on an agreed route.